From Category 1 clean-water events to Category 3 sewage-adjacent mold, each job gets the right protocol.
Category Assessment
📋Water Category Classification & Protocol Selection
Water source classification determines PPE requirements, containment tier, and disposal protocol on every Dedham mold job. We assess and document the water category before work begins.
Containment
🔥Negative Air Containment Setup
Physical containment is established before any material removal — 6-mil poly barriers, zipper entries, HEPA negative air machines creating inward airflow, and sealed HVAC registers. Spore migration during removal is prevented, not managed after the fact.
Extraction
🔨Contaminated Material Removal
Mold-contaminated drywall, insulation, subfloor sections, and framing members are physically removed, double-bagged in heavy-duty poly, and disposed of per Dedham, MA regulations. HEPA vacuuming of remaining structural surfaces removes loose spore material before treatment.
Treatment
💧EPA Biocide Application
After physical extraction, remaining structural surfaces are treated with EPA-registered antimicrobial agents rated for the contamination category. For Category 3 events, enhanced disinfectants are used. Encapsulant is applied to salvageable structural wood where warranted.
Drying
💨Structural Drying Where Needed
Structural drying after water-event removal: desiccant or refrigerant dehumidifiers, air movers, daily MC readings. We don't assume dry — we measure it.
Clearance
📄Independent Post-Removal Air Sampling
Third-party IH clearance sampling after every Dedham, MA removal job. Accredited lab results, written clearance report — objective confirmation the removal achieved its goal.